The amount of time it takes to remodel a bathroom can vary greatly depending on the scope of the project. A simple bathroom remodel, such as updating the fixtures, paint, and flooring, can take as little as a few days to a couple of weeks. Extensive remodel, such as a full gut and renovation, can take several weeks or even months to complete.
We break down common phases of bathroom renovations so that you are well-prepared to tackle this project.
How Much Time Does It Need To Remodel A Bathroom?
You can make your primary or powder room more spacious.
Regardless of what, each bathroom remodeling project requires the same three phases.
1. Phase of pre-construction
2. Construction phase
3. Phase after construction
Phase 1: Pre-Construction
The pre-construction phase of a bathroom remodel can take anywhere from a few days to several weeks, depending on the complexity of the project. This phase includes planning and designing, obtaining permits, and finalizing the budget and materials list.
During the planning and design phase, you will need to determine the scope of the project and create a design plan. This can include selecting the layout, fixtures, finishes, and materials to be used. This process can take several days to a few weeks, depending on how much time you are able to dedicate to it.
When the design plan is complete, you will need to obtain the necessary permits for the project. This can include building permits, plumbing permits, and electrical permits. The process of obtaining permits can take anywhere from a few days to a few weeks, depending on the complexity of the project and the requirements of your local building department.
Once the permits are obtained, the budget and materials list will be finalized. This can take a few days to a week.
You should also take time to prepare your home for the construction process, such as moving furniture, covering floors and taking down curtains, and making arrangements for any pets or children that may be in the home during the remodel.
Hiring a professional contractor can help ensure that the pre-construction phase runs smoothly and that all necessary permits and inspections are obtained on time.
Phase 2: Construction
The construction phase of a bathroom remodel can take anywhere from a few weeks to several months, depending on the scope of the project. This phase includes demolition, rough-in work (electrical, plumbing, HVAC), framing, installation of fixtures and finishes, and final clean-up and touch-ups.
During the demolition phase, the existing bathroom fixtures, flooring, and walls will be removed. This can take a few days to a week.
When the demolition is complete, the rough-in work (electrical, plumbing, HVAC) will be done. This can take a few days to a week. This step is crucial in making sure that all the necessary electrical, plumbing and heating, ventilation, and air conditioning (HVAC) systems are correctly installed so that they can be connected to the new fixtures and finishes.
The next step is the framing which involves putting up walls, floors, and ceilings. This can take a few days to a week.
After the framing is completed, the installation of fixtures and finishes will begin. This includes the installation of the toilet, shower, bathtub, sink, cabinetry, and countertops, as well as the flooring, tile, and paint. This process can take a week to several weeks, depending on the complexity of the project.
Once the construction is complete, the final clean-up and touch-ups will be done. This can take a few days.
Phase 3: After-Construction
After the construction phase of a bathroom remodel is complete, there are a few steps that need to be taken before the bathroom can be used. These steps can take anywhere from a few days to a few weeks, depending on the complexity of the project.
First, the bathroom will need to be inspected by the local building department to ensure that all work has been completed to code. This can take a day or two, depending on the schedule of the inspector.
Next, any necessary touch-ups or repairs will need to be made. This can include painting, caulking, or fixing any issues that were discovered during the inspection. This process can take a few days to a week.
Once the touch-ups and repairs are complete, the bathroom will need to be cleaned thoroughly. This includes cleaning the tile, grout, fixtures, and floors, as well as removing any construction debris. This process can take a day or two.
Finally, any final accessories or decor can be added to the bathroom. This includes items such as towel bars, toilet paper holders, and shower curtains. This process can take a day or two.
It’s worth noting that if you’re hiring a professional contractor to remodel your bathroom, they will be responsible for overseeing all of these steps and ensuring that everything is completed in a timely manner.
So, the total time it takes to remodel a bathroom can vary depending on the complexity of the project, but it is typically between 4-8 weeks.
Final Stage: Enjoy your New Bathroom
A modern, fresh bathroom can make your day more enjoyable and can add tremendous value to your house. No matter how much your bathroom renovation cost, it will be evident every morning as you brush your teeth.
What to Expect When Remodeling a Bathroom
This is a timeline that will help you plan your bathroom remodel.
- Pre-construction research takes 1-2 weeks
- Interviewing contractors: 1-2 Weeks
- Application for and obtaining permits takes 1 week
- Signing contracts takes 1-3 days
- Demolition (or break down): 1-2 Days
- 2 to 3 days for carpentry (e.g. designing and installing wooden bathroom vanities).
- It will take 2- 3 days for plumbing (e.g. moving the toilet or tub)
- 2 days of electrical work are required for bathroom bar lights, vanity lighting, and sconces installation
- Initial inspection: 1 Day (+ Waiting Time)
- Insulation: 1 Day
- Drywall installation: 3 days
- Paint takes 1-2 days
- Final inspection: 1 Day (+ Waiting Time)
- Tiling takes 2 days
- Trim (e.g. Trim (e.g., crown molding, cabinetry), takes 1-2 days
- Vinyl, ceramic tiles, engineered hardwood, and other flooring options are available. Floors (including vinyl, ceramic tiles, engineered wood, etc.): 2 Days
- Hookups (sink, toilet, etc. ): 1 Day
- Hardware & finishing touches (handles and lightbulbs, artwork, etc.): 2 Days
Conclusion
The time it takes to remodel a bathroom can vary depending on the scope of the project. A simple remodel, such as updating fixtures and painting, can take as little as a few days to complete. A more extensive remodel, such as a full gut and renovation, can take several weeks or even months. Factors that can affect the timeline include the size of the bathroom, the materials being used, and the complexity of the design. It’s best to consult with a contractor to get a more accurate estimate for the specific project.
Keep in mind that many things could affect your renovation schedule. There may be unexpected problems like mold or rot, or products may arrive damaged, and they will need to replace. Special-order items might take longer to arrive, so you may have to wait up to 8 weeks for them. Additionally, certain contractors like plumbers and carpenters may have scheduling conflicts that could delay your project.